The Future of Soil Stabilization

Quality Control

Ensure the seepage prevention system achieves "zero leakage" and long-term stability.

Fiberglass Geogrid Production Process

Plastic Geogrid Production Process

Generation process

1

Batching and Extrusion

Raw Material Selection: Primarily high-density polyethylene (HDPE) or polypropylene (PP), with approximately 2%-3% carbon black (for UV resistance) and antioxidants added.

Ingredients and extrusion SOP

2

Precision Punching

Process: After cooling, the thick sheet metal is punched with regular holes according to a preset arrangement (rectangular or square) using a precision punch press.

Precision stamping SOP

3

Longitudinal and Transverse Stretching

For unidirectional geogrids, longitudinal stretching essentially completes the entire production process at this step.
This longitudinal and transverse stretching step is only applicable to bidirectional geogrids.

Lateral stretching SOP

Longitudinal stretching SOP

4

Winding and Inspection (Heat Setting & Winding)

Perform physical property tests such as tensile strength and elongation. After passing the tests, roll and package the product into standard lengths (usually 50m or 100m).

Roll forming and testing SOP

Defective products

prohibited from leaving the factory